GS910/XST Series 10 Gigabit Ehternet Unmanaged Switch Installation and User's Guide
9. Position the two brackets on top of the switch and use a pencil to mark
the wall with the locations of the four holes in the brackets. See
Figure 28.
x
Figure 28. Marking the Screw Hole Locations for the Top Brackets
10. Remove the two brackets from the top of the switch.
11. Pre-drill the marked locations on the wall at the locations marked in
Step 9.
12. Install the four plastic anchors into the wall in the holes.
52