Allied Telesis GS910/XST Series Installation And User Manual page 50

10 gigabit ethernet unmanaged switches
Table of Contents

Advertisement

GS910/XST Series 10 Gigabit Ehternet Unmanaged Switch Installation and User's Guide
3. Have another person hold the switch with the brackets at the location
where the switch is to be installed, while use a pencil to mark the wall
at the locations of the four holes in the brackets. See Figure 25.
x
Figure 25. Marking the Screw Hole Locations
4. Pre-drill the marked locations on the wall marked in Step 3.
5. Install the four plastic anchors into the wall in the holes.
6. Position two brackets on the wall and drive screws through the holes
to attach the brackets on the wall. See Figure 26.
x
Figure 26. Driving the Screws through the Holes
50

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gs910/10xstGs910/18xstGs910/26xst

Table of Contents