Maintenance Tests - Siemens MOBILETT Plus HP Maintenance Instruction

Hide thumbs Also See for MOBILETT Plus HP:
Table of Contents

Advertisement

Inspection and Maintenance
2.5

Maintenance tests

Use these service programs to check the display, filament heating, rotating anode and
capacitors.
While the test is running, observe the display. If an error is determined during the course
of the test, the program is interrupted and the associated error is displayed, accompanied
by an audible signal.
Additional information about each test can be found in the section "List of test programs
available in service mode" in the Service Instructions. The test sequences are also
described in this section.
Start the programs by activating the "Collimator lamp."
SIE
Display test
PMF
Filament test
PMF
Rotating anode test
PMF
Capacitor bank and charge test
P04
P01
FIL PASS
P02
rot PASS
P03
CAP PASS = The capacitor bank and charge test was successfully completed.
If an error is determined during any of the tests, the current program stops and the follow-
ing message appears:
Err xx
Siemens AG
Medical Solutions
Display test. Check whether the display and the LEDs light up and
whether the buzzer sounds. The test will automatically be repeated
once.
Filament test. When the test is successfully completed, the following
message will appear for 4 seconds:
= The filament test was successfully completed.
Rotating anode test. During this test, rotating anode start-up is checked
and the rotation frequency is displayed. The following message
appears when the test is successfully completed:
= The rotating anode test was successfully completed.
Capacitor bank and charge test. During the test, the actual voltage in
the capacitor bank is displayed. The following message appears when
the test is successfully completed:
= Test results are "not valid."
SPR8-220.101.04.03.02
07.05
Page 41 of 64
CS PS 24
41
MOBILETT Plus HP

Advertisement

Table of Contents
loading

Table of Contents