Siemens MOBILETT Plus HP Maintenance Instruction page 24

Hide thumbs Also See for MOBILETT Plus HP:
Table of Contents

Advertisement

24
Technical Safety Checks,
Test Certificate - check
6. Product-specific checks
7. Test result / evaluation:
MOBILETT Plus HP
SPR8-220.101.04.03.02
07.05
Maintenance instructions – check/
Comments
2.2.6 Handle, check:
SIM Mounting
2.2.7 Collimator adjustment knobs, check:
SIM Mounting
2.2.10 Arm system mounting, check:
SIM Screws and locknuts
2.2.10.1 Adjustment screw, checks:
SIM Lock nuts
SIM Base Mounting
2.2.10.2 Arm connecting piece, check:
SIM Screws and nuts
2.2.10.3 Single tank fork, checks:
SIM Screw connections on the fork
SIM Single tank screw connections
2.10 Remote exposure switch system
(optional), check:
SIE Function of remote exposure switch
system
2.11 DAP measuring system (optional),
check:
SIE Function of DAP measuring system
Evaluate the long-term trends of the pro-
tective conductor resistance and the equiv-
alent unit leakage current by comparing
the current measuring values with those of
the preceding technical safety check. A
sudden or unexpected increase of the
measured values may indicate a safety-rel-
evant defect - even if no limit value is
exceeded.
Fill in the result of the check.
Let the operator, or a person authorized by
the operator, sign the TSC protocol.
Hand the TSC protocol over to the opera-
tor, or a person authorized by the operator.
Page 24 of 64
CS PS 24
General
Siemens AG
Medical Solutions

Advertisement

Table of Contents
loading

Table of Contents