Benchmark Platinum-Edge [ii]: Operation-Service Manual
SECTION 3 - START SEQUENCE
3.4.3 BMK2000 Air/Fuel Valve Position and Energy Input
TABLE 3-4a: BMK2000 Air/Fuel Valve Position – NATURAL GAS
AIR/FUEL VALVE POSITION
(% OPEN)
18% (Stop Level)
20%
30%
40%
50%
60%
70%
80%
90%
100%
TABLE 3-4b: BMK2000 Air/Fuel Valve Position – PROPANE GAS
AIR/FUEL VALVE POSITION
(% OPEN)
18% (Stop Level)
20%
30%
40%
50%
60%
70%
80%
90%
100%
OMM-0137_J •
12/20/2022
ENERGY INPUT
(BTU/HR)
100,000 (29.3 kW)
143,000 (41.9 kW)
388,000 (113.7 kW)
759,000 (222.4 kW)
1,069,000 (313.2 kW)
1,283,000 (375.9 kW)
1,476,000 (432.5 kW)
1,675,000 (490.1 kW)
1,833,000 (537.1 kW)
2,000,000 (586.0 kW)
ENERGY INPUT
(BTU/HR)
100,000
126,600
363,000
677,000
898,000
1,070,000
1,242,000
1,523,000
1,845,000
2,000,000
Technical Support • (800) 526-0288 • Mon-Fri, 8 am - 5 pm EST
BOILER ENERGY INPUT
(% OF FULL CAPACITY)
5.7%
11%
23%
37%
51%
61%
74%
83%
93%
100%
BOILER ENERGY INPUT
(% OF FULL CAPACITY)
5.0%
6.3%
18.2%
33.9%
44.9%
53.5%
62.1%
76.2%
92.3%
100%
Page 27 of 167