Section 1: Safety Precautions; Warnings & Cautions - Watts AERCO Benchmark BMK5000 Operation And Service Manual

Platinum boilers with edge controller
Hide thumbs Also See for AERCO Benchmark BMK5000:
Table of Contents

Advertisement

Benchmark Platinum-Edge [ii]: Operation-Service Manual

SECTION 1: SAFETY PRECAUTIONS

SECTION 1:
1.1 WARNINGS & CAUTIONS
Installers and operating personnel MUST, at all times, observe all safety regulations. The
following warnings and cautions are general and must be given the same attention as specific
precautions included in these instructions. In addition to all the requirements included in this
AERCO Instruction Manual, the installation of units MUST conform with local building codes, or,
in the absence of local codes, ANSI Z223.1 (National Fuel Gas Code Publication No. NFPA-54)
for gas-fired boilers and ANSI/NFPASB for LP gas-fired boilers. Where applicable, the
equipment shall be installed in accordance with the current Installation Code for Gas Burning
Appliances and Equipment, CSA B149.1, and applicable Provincial regulations for the class;
which should be carefully followed in all cases. Authorities having jurisdiction should be
consulted before installations are made.
See section 1.4 for important information regarding installation of units within the
Commonwealth of Massachusetts.
IMPORTANT!
This manual is an integral part of the product and must be maintained in legible condition. It
must be given to the user by the installer and kept in a safe place for future reference.
WARNING!
Do not use matches, candles, flames, or other sources of ignition to check for gas leaks.
Fluids under pressure may cause injury to personnel or damage to equipment when
released. Be sure to shut off all incoming and outgoing water shutoff valves. Carefully
decrease all trapped pressures to zero before performing maintenance.
Before attempting to perform any maintenance on the unit, shut off all gas and electrical
inputs to the unit.
The exhaust vent pipe of the unit operates under a positive pressure and therefore must
be completely sealed to prevent leakage of combustion products into living spaces.
Electrical voltages up to 120 VAC (BMK750 – 2000), 208 or 480 VAC (BMK2500 – BMK3000),
480 VAC (BMK4000 & 5000N), or 208, 480 or 575 VAC (BMK5000 & 6000) and 24 volts AC may
be used in this equipment.
front panel door) must be installed at all times, except during maintenance and servicing.
A single-pole (120 VAC units) or three-pole (220 VAC and higher units) switch must be
installed on the electrical supply line of the unit. The switch must be installed in an easily
accessible position to quickly and safely disconnect electrical service. Do not affix switch
to unit sheet metal enclosures.
CAUTION!
Many soaps used for gas pipe leak testing are corrosive to metals. The piping must be
rinsed thoroughly with clean water after leak checks have been completed.
DO NOT use this boiler if any part has been under water. Call a qualified service technician
to inspect and replace any part that has been under water.
OMM-0137_J •
12/20/2022
SAFETY PRECAUTIONS
Therefore, the cover on the unit's power box (located behind the
Technical Support • (800) 526-0288 • Mon-Fri, 8 am - 5 pm EST
Page 9 of 167

Advertisement

Table of Contents
loading

Table of Contents