Discharge Head Assembly; Step 8; Cable Mount & Truss Assembly - HARVEST H1362 Assembly Manual

Auger
Table of Contents

Advertisement

Step 7

(Discharge Head Assembly)

All tubes & flighting should now be assembled together. Now the discharge head should be attached. First
align the 6 studs on the flighting with the 6 holes in the discharge head. Fasten the discharge head to the
flighting using (6) 1/2" lock washers & (6) 1/2" lug nuts. Thread lug nuts on flat side against the lock washers.
Tighten the 6 lug nuts. Now fasten the head to the tube using (10) 1/2" x 1-1/2" flange bolts & nuts. If
assembling an H1062 & H1082, place the cable truss mount brackets (10680) on the left & right side of the
flange & secure with the flange bolts & nuts. These brackets are not used on the H1072.

Step 8

(Cable Mount & Truss Assembly)
In Step 8 the lower cable mount brackets will be installed. On the 1
the left & right side of the carriage bracket as shown in fig.8.1. These will be fastened using (2) 5/8" x 1-1/2"
flange bolts & nuts. Be sure to angle the cable mount bracket slightly upwards as shown in figure 8.1.
Assemble (2) 3/4" eyebolts onto brackets using (2) 3/4" flat washer & (2) 3/4" flange nuts.
Harvest International H13XX Assembly Manual
Fig. 7.1
st
tube bolt cable mount brackets (30420) to
Fig. 8.1
Page 7 of 35

Advertisement

Table of Contents
loading

This manual is also suitable for:

H1372H1382

Table of Contents