Step 14
Locate the #60 chain & the #60 connector link. Place the chain around the sprockets as shown in Fig. 15.1.
Secure chain with connector link. When connector link is installed & the loop has been completed, push the
idler sprocket in the chain to achieve good tension. When proper tension is achieved tighten the idler sprocket.
Now grease top & bottom bearings with multi-lith grease.
Fig. 14.1
Step 15
(PTO Shaft Assembly)
Next, insert a 3/8" x 1-1/2" square key into the bottom shaft. Slide PTO shaft onto lower drive shaft. Align
holes in PTO shaft with hole in drive shaft. Using a punch will help in this application. Secure using a 3/8" x
3-1/2" hex bolt & top lock nut. Tighten set screw on PTO shaft.
Fig. 15.1
Fig. 15.2
Harvest International H13XX Assembly Manual