HARVEST H1362 Assembly Manual page 6

Auger
Table of Contents

Advertisement

Step 5
(H1372 Only)
th
Next, place the 4
tube on stands and connect the flighting to the 3
(3) 5/8" x 3" hex bolts & top lock nuts. After connecting the flighting, slide the 3
connect the tubes in the top & bottom 2 holes using (4) 1/2" x 1-1/2" flange bolts & nuts. Next place 2 cable
truss mount brackets (10680) on the left & right side of the 2
(6) 1/2" x 1-1/2" flange bolts & nuts. Next, attach a 3/8'' quick link to each bracket as shown in fig. 4.1.
(After completing this step skip to Step 7)
Step 6
(H1382 Only)
th
Next, place the 4
tube on stands and connect the flighting to the 3
(3) 5/8" x 3" hex bolts & top lock nuts. After connecting the flighting, slide the 3
connect the tubes using (10) 1/2" x 1-1/2" flange bolts & nuts.
Harvest International H13XX Assembly Manual
nd
tube flighting. Connect the flighting using
nd
tube flange and fasten tube & brackets using
Fig. 5.1
nd
tube flighting. Connect the flighting using
Fig. 6.1
rd
th
& 4
tube together &
rd
th
& 4
tube together &
Page 6 of 35

Advertisement

Table of Contents
loading

This manual is also suitable for:

H1372H1382

Table of Contents