HARVEST H1362 Assembly Manual page 33

Auger
Table of Contents

Advertisement

Step 49
Next the wheel will be installed on the swing hopper. First, locate the 4 hopper tires (30104), 4 clevis pins, 4
spacer tubes (10186) & 4 lynch pins. Place the spacer tube through the first hole in the outside of the swing
hopper. Slide the clevis pin through the tire and the spacer making sure the offset part of the rim is facing in
towards the swing hopper as shown in fig. 49.1. Secure the spacer, tire, & clevis pin by placing a 3/16" lynch
pin through the end of the clevis pin. Repeat for all 4 hopper tires. (For more ground clearance install the tire in
the bottom hole.)
Step 50
Next, install the upper transition flighting (30883) on the lower drive shaft attached to the swing tube flighting.
To do this, slide a 1/4" x 1" square key into key way on swing tube flighting shaft. Slide upper transition
flighting onto shaft aligning the key and keyway. To secure the transition flighting thread the set screw that is
5/16" x 1-1/4" into hole on knuckle (Fig. 50.1). After set screw is tightened, thread a 5/16" flange nut onto set
screw and tighten to lock set screw in place.
Harvest International H13XX Assembly Manual
Fig. 48.1
Fig. 50.1
Page 33 of 35

Advertisement

Table of Contents
loading

This manual is also suitable for:

H1372H1382

Table of Contents