Steps - HARVEST H1362 Assembly Manual

Auger
Table of Contents

Advertisement

Step 12
Next, slide the 4 bolt 1-3/4" cast flange bearing over the shaft making sure the grease zerk is located on the
same side as the idler sprocket. (If the shaft has surface rust, clean first with an emry cloth) Secure the 4 bolt
bearing to the infeed housing using (4) 1/2" x 1-1/2" carriage bolts & flange nuts as shown. When completed
use a punch to rotate the shaft so the keyway is in an easy to access position.
Fig. 12.1
Step 13
Next, insert a 3/8" x 1-1/2" square key into the bottom shaft. Slide the 20 tooth sprocket onto the bottom shaft
as shown in Fig. 13.1. Use a measuring tape, measure the distance from the center of the top & bottom sprocket
to the infeed housing. Once sprockets are aligned, apply lock-tite to set screws & tighten.
Fig. 13.1
Harvest International H13XX Assembly Manual
Page 10 of 35

Advertisement

Table of Contents
loading

This manual is also suitable for:

H1372H1382

Table of Contents