Check of operating status
3.3 Shutdown
Follow the procedures
(1) Absolute and gauge pressure transmitters (FKG/FKP or FKA/FKH) :
Close the valve slowly to stop applying a pressure.
The transmitter is set in the measurement stop status.
(2) Flow and differential pressure transmitter (FKC) :
Close the stop valve on the high pressure
side (HP side) slowly.
Open the equalizing valve..
Close the stop valve on the low pressure side
slowly
PRECAUTION
INF-TN5FCXA2V5e-E
from the transmitter.This is to protect the transmitter from freezing, corro-
sion, etc...
Close
Close
Open
Close
15