5
MAINTENANCE
No maintenance of transmitter is necessary.
According to the application conditions and the measured process, a periodic check of the out-
put signal of the transmitter has to be done by skilled people (suggested period 36 months).
-
Leak check of the tightness of the transmitter and the process connections as often as
required.
-
Check and if possible clean all wetted transmitter parts (see parts list) to make guar-
the reasons of the corrosion and replace and adapt the concerned parts or replace the
complete transmitter with an adapted one. Please follow the replacement procedure of
the measuring cell described later.
-
Visual inspection of the non wetted parts of the transmitter.
Protect or replace the transmitter if necessary.
68
INF-TN5FCXA2V5e-E