Commissioning The Device; Switching On The Device; Configuring Automatic Switch-On Of Device - Siemens SIMATIC IPC647E Operating Instructions Manual

Hide thumbs Also See for SIMATIC IPC647E:
Table of Contents

Advertisement

Commissioning the device

4.1

Switching on the device

Requirement
• The power supply is connected. (Page 57)
Procedure
1. Switch the on/off switch (in case of redundant power supply: both on/off switches) on the
rear of the device (position | ).
2. Press the on/off button at the front of the device behind the front panel door.
Information on the position of the switch and the button is available under "Operator
controls (Page 25)".
Commissioning the installed Windows® operating system
You can find information on the first switch on of the device and on commissioning the
installed Windows® operating system in the documentation of your operating system, see
"Important instructions and manuals for operating the device (Page 11)".
4.2

Configuring automatic switch-on of device

In the firmware settings you can define that the device automatically switches on again after
a disconnection from the supply voltage as soon as the supply voltage is available again.
The minimum downtime required for the supply voltage depends on the configuration of the
device.
Configure this function with the firmware setting:
• State After G3
You can find information on this in the firmware/BIOS description, see "Important instructions
and manuals for operating the device (Page 11)".
SIMATIC IPC647E
Operating Instructions, 09/2022, A5E52254141-AA
4
65

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents