Commissioning - Gira One 5062 00 Operating Instructions Manual

Switching actuator 2-gang / blind actuator, 1-gang 16 a with binary input, 3-gang
Table of Contents

Advertisement

Switching actuator 2-gang / blind actuator, 1-gang 16 A with binary input, 3-gang
4.2

Commissioning

Commissioning the device
NOTICE!
Incorrect load control due to undefined relay state at delivery.
Risk of destruction of connected drive motors.
During commissioning, before switching on the load, ensure that all relay contacts
are open by applying the bus voltage. Observe commissioning sequence!
Switch on the bus voltage.
Wait about 10 s.
Connect the load circuit.
Delivery state: The output is set as a Venetian blind output. Operation of the
blind output possible via input 1 (UP) and input 2 (DOWN). Input 3 has no
function.
Function of Inputs in the as-delivered state
Input
1
1
1
2
2
2
3
The device is commissioned with the Gira Project Assistant (GPA) version 5 or
higher.
Safe-state mode
The safe-state mode stops the execution of the program.
Only the system software of the device is still functional. Diagnosis functions and pro-
gramming of the device are possible.
Activating safe-state mode
Switch off the bus voltage or disconnect the device from the bus.
Wait about 10 s.
Press and hold down the programming button.
82404232
Push-button (NO con-
tact)
Press briefly (< 0.4 s)
Press briefly (< 0.9 s)
Press for a long time (>
0.9 s)
Press briefly (< 0.4 s)
Press briefly (< 0.9 s)
Press for a long time (>
0.9 s)
---
29.11.2022
Function
Stop
Adjusting the slats UP
Raise
Stop
Adjusting the slats DOWN
Lower
---