Commissioning - Gira KNX 5061 00 Operating Instructions Manual

Switching actuator, 1-gang 16 a with binary input, 3-gang
Table of Contents

Advertisement

Switching actuator, 1-gang 16 A with binary input, 3-gang
Observe ambient temperature. Ensure adequate cooling.
Connect the device to KNX with the correct polarity.
Connect load as shown in the connection example (see figure 5).
If required, connect potential-free contacts or condensation/leakage sensors to
inputs 1...3, or NTC temperature sensors to input 3 (see figure 2).
Install the device in the appliance box.
In secure operation: The device certificate must be removed from the device
and stored securely.
The COM reference potential must not be connected together with COM con-
nections of other devices!
4.2

Commissioning

Commissioning the device
NOTICE!
Undefined relay state at delivery.
Unexpected control of connected loads.
During commissioning, before switching on the load, ensure that all relay contacts
are open by applying the KNX bus voltage. Observe commissioning sequence!
Switch on the KNX bus voltage.
Wait about 10 s.
Connect the load circuit.
Delivery state: Operation of the output via switch at input 1 (ON / OFF) pos-
sible. Inputs 2 and 3 have no function.
Function of Inputs in the as-delivered state
Input
1
1
2
3
Load physical address and application program
Press the programming button.
The programming LED lights up.
Load physical address and application program using the ETS.
82404332
Switch
closed
open
---
---
29.11.2022
Function
ON
OFF
---
---
8 / 12