Maintenance
4
5
3
The following lubrication points are lubricated by the central
lubrication points A and B.
1. Arm bucket coupling pin (1 point).
2. Arm link coupling pin (1 point).
3. Boom arm coupling pin (1point).
4. Bucket cylinder foot pin (1 point).
5. Arm cylinder rod end (1 point).
6. Arm cylinder foot pin (1 point).
7. Boom cylinder rod end (2 points).
8. 1st to 2nd boom pin (3 point).
9. Boom foot pin (2 points).
10. Boom adjust cylinder foot pin (1 point).
11. Boom cylinder foot pin (2 points).
12. Lubricate swing circle (2 points).
PW180-7E0 – VEAM400102
A
2
1
B
A
4.11 Maintenance procedure
B
6
7
12
Every 100 hours service
8
9
10
11
12
4-63