13. Power Up and Installation Completion

Initial System Checkout and Preparation for Power Up

Before Installing Rectifiers

Prior to installing rectifiers, verify that the correct ac voltage is present at the AC connectors in the
rectifier shelves.
Note: Disregard if this was done as part of the "AC Connection and Wiring" procedure.

Safety Reminder

Some of the following procedures are performed while ac voltage is present at the cabinet; exercise
extreme caution and observe all precautions described in the safety section of this product manual.

Controller Front Panels

Illustrations

Refer to the following figures for illustrations of the controller front panels:
Figures 13-1 Millennium II Controller
Page 132
© Copyright 2021 ABB. All rights reserved.
Figure 13-1: Galaxy Millennium II Controller Front Panel, Round