Cabinet Ground and Central Office Ground

Cabinet Ground Procedure

The next step is to ground the cabinet framework. Local grounding practices will determine the
grounding method and the size of cable connected to the cabinet. A 2 - gauge pigtail (847992070), as
shown in Figure 5 - 6, is provided for this purpose.
Step
Run and connect the framework ground lead as shown in Figure 5 - 6.
Torque connection as specified in Figure 5 - 6.

Central Office Ground Procedure

The system ground should be connected to the building's principal ground point (Central Office
Ground). The conductor size must conform to local standards.

Centralized Architecture:

Follow local practice for Centralized Architecture

Distributed Architecture:

Connection to the power system is through the M10 studs located on the distribution return bus.
See Figure 5 - 6 (full - height cabinet).
Step
Run and connect the system ground lead to the initial cabinet return bus. This connection will connect the re-
turn side of the dc system to earth ground.
Torque connections as specified in Figure 5 - 6.
Page 32
© Copyright 2021 ABB. All rights reserved.
Cabinet Ground
Action
Central Office Ground for Distributed Architecture
Action

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gps 4848/100Gps 4827Gps 4830Gps 434

Table of Contents