Contactor Control Board

Battery and Alarm Fuses and Circuit Breakers

If the battery connection panel is equipped with battery fuses and alarm fuses, do not install them at
this time; the battery fuses should be installed after batteries have been connected.
If the battery connection panel is equipped with circuit breakers, they should be installed but left in
the OFF position.
Note: The batteries will be connected in Section 13, Power Up and Installation Completion.
Page 127
© Copyright 2021 ABB. All rights reserved.
Figure 10-4: BJN Low Voltage Battery Disconnect (LVBD) Contactor Control Board