11. Fascia Cover Installation
Introduction
This section provides the installation procedure for the fascia covers.
The covers are optional on centralized architecture.
Installing the Fascia Covers
One front Fascia Cover and associated hardware is provided with each GPS cabinet. Two End of Line-
up Fascia Covers and associated hardware are provided with GPS cabinet equipped with a controller.
Additional and different Fascia Panels (supplied with all necessary hardware) must be ordered.
Refer to Figure 11-1 for an illustration of this procedure. Refer to Figure 5-4 and Figure 5-5 for fascia
mounting brackets installation
Step
Install each fascia cover using the four 8-32 nuts provided. Fascia panels are optional on the left and right ends
Page 129
© Copyright 2021 ABB. All rights reserved.
.
Installing the Fascia Covers
Optional on Centralized Architecture Cabinets
Figure 11-1: Fascia Cover Installation
Action