3. Getting Started

Tools and Hardware
You will need the following tools and hardware to install the Galaxy Power System:
·
Material-handling equipment to unload the cabinet at the installation site, remove from shipping
container, and set in final position [minimum lifting capacity: 900 lbs. (410Kg)
Note: Use the equipment weights and dimensions as a guideline for choosing material-handling
equipment.
·
Drill and drill bits to install floor anchors
·
3/16-inch (5mm) Allen-head wrench (provided)
·
Insulated hand tools
·
Screw drivers (flat-blade and Phillips)
·
Wire cutters and stripper
·
Torque wrenches (see Table 3-A) 35-513 in·lbs (4-58 N·m)
·
Sockets:
Metric
8mm
10mm
13mm
17mm
19mm
--
--
·
Crimp tools
22 - 16 gauge
10 - 500 MCM (5-120mm
·
Jeweler's screwdriver
·
Digital multimeter (DMM) with 0.05% accuracy on dc scale
·
Load box (200 amperes @ 48V)
·
Laptop or personal computer (PC) loaded with Windows 3.1 or later (optional)
·
ESD wrist strap*
*Equipment is ESD sensitive. It is required that an ESD wrist strap be worn during installation and
repair. An ESD wrist strap (408157105) is provided with each controller.
Page 20
© Copyright 2021 ABB. All rights reserved.
English Equivalent
5/16"
--
1/2"
11/16"
3/4"
3/8"
9/16"
2
)
Hardware
M5
M6
M8
M10
M12
1/4"
3/8"

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gps 4848/100Gps 4827Gps 4830Gps 434

Table of Contents