Preparation For Installation; Requirements For The Installation Site, Power Supply - ABB SCC-S Operator's Manual

Table of Contents

Advertisement

C
2
H A P T E R

Preparation for Installation

Requirements for the Installation Site, Power Supply

Short Gas Paths
Adequate Air Circulation
Protection against Adverse Environmental Conditions
Environmental Conditions
Ambient temperature
Relative air humidity
Power Supply
Input voltage
Power consumption
The sample gas feed unit should be installed as close as possible to the gas
analyzer.
Ensure adequate natural air circulation around the sample gas feed unit. Avoid
heat buildup.
The sample gas feed unit should be protected from
Cold,
Heat sources such as the sun, furnaces, boilers,
Large temperature variations,
Strong blasts,
Accumulations of dust and dust infiltration,
Corrosive atmospheres,
Vibration.
+10 to +40 °C during operation
–25 to +60 °C during storage and transport
 75 % year-round average,  95 % on 30 days per year,
occasional light condensation permissible
230 VAC,  10 %, 50 Hz or 115 VAC,  10 %, 60 Hz
230 VAC, 50 Hz: max. 300 VA
7

Advertisement

Table of Contents
loading

Table of Contents