3.4 Installation Verification

Table 3-2 Installation checklist
No.
01
02
03
04
05
06
07
09
10
11
Issue 04 (2019-09-16)
Item
Acceptance Criteria
SmartLi
The SmartLi is securely installed and does not tilt due to
installation
vibration.
Neat arrangement
The SmartLi and its adjacent cabinets are neatly arranged
and secured with connecting plates.
Cable layout
Cables are routed properly and cable routing meets
customer requirements.
Cable labels
Both ends of a cable are labeled. Labels are concise and
easy to understand.
Cable ties
Cable ties are secured evenly and no burr exists.
Cable connections
The output, and battery cables are securely connected. For
the cables secured by screws, the spring washers are
flattened.
Grounding
The resistance between the SmartLi ground bar and the
equipment room ground bar is less than 0.1 ohm.
Battery cable
The SmartLi is correctly connected to the UPS.
connections
Checking the
Check whether the pressure gauge pointer is in the green
pressure gauge
zone and whether the pressure value is greater than 1.6
MPa.
Foreign matter
The inside and outside of the cabinet, and other operating
components, are free from conductive dust.
cleaning inside
the cabinet
1. There is no foreign matter (such as copper wires and
2. There is no foreign matter on the copper bar terminals.
3. There is no foreign matter around switch terminals.
4. There is no foreign matter on the bottom plate of the
5. There is no foreign matter on the rear module subrack.