UPS5000-S-(35 kVA-210 kVA)
User Manual (Singapore, 35 kVA Power Modules)
Figure 3-9 Installing expansion bolts (unit: mm)
1.
Drill holes in the ground by using a hammer drill. The hole depth is 52 mm to 60 mm.
2.
Partially tighten the expansion bolt and vertically insert it into the hole. Hit the
expansion bolt using a rubber mallet until the expansion sleeve is fully inserted into the
hole.
3.
Partially tighten the expansion bolt.
4.
Remove the bolt, spring washer, and flat washer.
Step 3 Wheel the cabinet to the installation position.
Step 4 Adjust the four anchor bolts at the bottom of the UPS cabinet until all the four castors at the
bottom hang in the air and the anchor bolts bear all of the cabinet weight.
Step 5 Remove the rear cover from the cabinet and open the front door.
Step 6 Remove the four rubber plugs (two at the front and two at the rear) from the bottom of the
cabinet.
Issue 02 (2020-01-10)
All manuals and user guides at all-guides.com
Copyright © Huawei Technologies Co., Ltd.
3 Installation
55