UPS5000-S-(35 kVA-210 kVA)
User Manual (Singapore, 35 kVA Power Modules)
Battery Maint. screen
Perform battery maintenance when no alarm is active on the UPS. Otherwise, the UPS
may supply no power.
A proportion of battery capacity will discharge during battery maintenance. This reduces
the discharge time before the next charge.
Do not perform battery maintenance when a D.G. is connected.
Battery maintenance includes Forced Equalized Charging, Shallow Dis. Test, and Capacity
Test.
Figure 4-41 Battery Maint. screen
Item
Forced Equalized Charging
Shallow Dis. Test
Capacity Test
USB Operations
You can export Fault Data, and perform Upgrade Software, BSP Upgrade, Export Config.,
and Import Config. with USB.
Multi-brand is used to import the brand information of a partner to the corresponding
WebUI.
Issue 02 (2020-01-10)
All manuals and user guides at all-guides.com
Description
Forcibly perform equalized charging on batteries.
Partially discharge batteries. A shallow discharge test can
be conducted to test the battery loop reliability and short-
time discharge capacity when the batteries have not
discharged for a long time.
Fully discharge batteries. A deep discharge test is
conducted to obtain the battery discharge performance
data.
Copyright © Huawei Technologies Co., Ltd.