Step 2: Preparing For The Transmitter Connections - Siemens SITRANS F Operating Instructions Manual

Coriolis flowmeters with hart
Hide thumbs Also See for SITRANS F:
Table of Contents

Advertisement

Connecting

5.7 Step 2: Preparing for the transmitter connections

5.7
Step 2: Preparing for the transmitter connections
As long as the device is energized, the lid of the housing on the sensor connection area
may only be opened by qualified personnel.
Before removing the terminal cover, the auxiliary power must be switched off from all poles.
Following installation, the terminal cover must be screwed back on again.
1. Remove blind plugs where required and mount cable glands.
2. Remove lid lock screw for terminal connections lid.
3. Remove lid for terminal connections.
A label with a graphic showing the terminal connections is placed at the back of the terminal
connections lid.
58
WARNING
2
3
Input/output connection (channels 2 to 4)
Power supply connection
Current output/HART connection (channel 1)
1
Operating Instructions, 03/2012, A5E03361511-01
SITRANS FC430 with HART

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sitrans fc430

Table of Contents