Viking Oxeo PR LCP Operator's Manual page 86

Inert gas extinguishing system
Table of Contents

Advertisement

Inspections
Interval
Listed below are important inspections necessary to ensure that the system functions prop-
erly, at its best efficiency and without failure. Perform these inspections on a weekly basis and
record the performance in the log book.
Contact an Authorized Distributor if you have any questions concerning the inspections that
need to be performed. Contact can be established through the manufacturer, see page 2.
A master copy containing all mentioned inspection questions is included as a checklist in the Appen-
dix to this document.
1. Clean the system (See "Cleaning" on page 87.)
2. Check the operability of the system weekly based on the following questions.
Do the contact pressure gauges show system pressure?
At 15 °C (59 °F) the pressure amounts to 200 bar (2901 psi) or 300 bar (4351 psi) depending on
the system.
Have all extinguishing agent containers been fitted with the intended release devices?
Ensure that the extinguishing agent containers are attached correctly.
Do the extinguishing agent containers contain the required quantity including any poten-
tial reserve quantities in accordance with the installation certificate?
Are the extinguishing agent containers, valves, release devices, hoses, selector valves, non-
return valves, and pneumatic pilot lines in sound condition?
Are the electrical pilot lines leading to the fire detection and suppression control panel and
the equipotential bonding connected properly and in sound condition?
Are the pipe system, the pipe support and the extinguishing nozzles intact?
Are the alarm devices intact?
Are the manual releases accessible and in sound condition?
Are the automatic fire detectors intact?
Are the discharge zones of the extinguishing nozzles unobstructed?
Are all wall breakthroughs sealed off to the adjoining zones?
Are the pressure relief devices closed?
Are the flow openings of the pressure relief devices unobstructed?
84
Operator's Manual | Oxeo PR LCP | F_101821 Rev 02 | 08-2022 | en

Advertisement

Table of Contents
loading

Related Products for Viking Oxeo PR LCP

Table of Contents