Autel MaxiCharger DC Fast Installation And Operation Manual page 48

Table of Contents

Advertisement

Figure 5-19 Installing the Charging Modules (for MaxiCharger DC 240)
Table 5-8 Charging Module Installation Specifications (for MaxiCharger DC 240)
Type
MaxiCharger DC 160
(EF160A3001)
MaxiCharger DC 180
(EF180A3001)
MaxiCharger DC 200
(EF200A3001)
MaxiCharger DC 220
(EF220A3001)
MaxiCharger DC 240
(EF240A3001)
Rated Power
160 kW
180 kW
200 kW
220 kW
240 kW
Number of
Location
Modules
8 PCS
1, 2, 3, 4, 7, 8, 9, 10
9 PCS
1, 2, 3, 4, 5, 7, 8, 9, 10
1, 2, 3, 4, 5, 7, 8, 9, 10,
10 PCS
11
1, 2, 3, 4, 5, 6, 7, 8, 9,
11 PCS
10, 11
1, 2, 3, 4, 5, 6, 7, 8, 9,
12 PCS
10, 11, 12
42

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the MaxiCharger DC Fast and is the answer not in the manual?

Questions and answers

Brian Hughes
March 5, 2025

How do I turn on our 120kW charger remotely, from https//uscloud.autelenergy.com/charging reality.

User image 67c7e6a70f307
1 comments:
Mr. Anderson
March 5, 2025

The Autel MaxiCharger DC Fast 120kW charger can be managed remotely using the Autel Charge Cloud. Through the cloud platform, you can access the charger status, monitor energy consumption, and manage user data. However, the specific steps for turning the charger on remotely are not provided in the available information.

This answer is automatically generated