Preparing For Electrical Cable Installation - Autel MaxiCharger DC Fast Installation And Operation Manual

Table of Contents

Advertisement

Preparing for Electrical Cable Installation

To prepare for cable installation
Reinstall the cable gland plate.
CAUTION
If the cable gland for the Ethernet cable is not used, make sure that the cable gland is
closed and sealed.
Guide the AC input wires (C) and Ethernet cables (E) through the cable gland
plate as instructed in the following figure and tighten the four fasteners to
secure the cable gland plate.
Figure 5-10 Guiding the Cables through the Cable Gland Plate
CAUTION
If it is necessary, install the cable gland over the Ethernet cable.
The cable gland (D) is optional.
35

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the MaxiCharger DC Fast and is the answer not in the manual?

Questions and answers

Brian Hughes
March 5, 2025

How do I turn on our 120kW charger remotely, from https//uscloud.autelenergy.com/charging reality.

User image 67c7e6a70f307
1 comments:
Mr. Anderson
March 5, 2025

The Autel MaxiCharger DC Fast 120kW charger can be managed remotely using the Autel Charge Cloud. Through the cloud platform, you can access the charger status, monitor energy consumption, and manage user data. However, the specific steps for turning the charger on remotely are not provided in the available information.

This answer is automatically generated

Table of Contents

Save PDF