Table 5-1 Location Requirements (for MaxiCharger DC 120)
Parameter
X1
X2
X3
Y1
Y2
Y3
Table 5-2 Location Requirements (for MaxiCharger DC 240)
Parameter
X1
X2
X3
Y1
Y2
Y3
Choose a site where the charging cable is of sufficient length to be connected to
the EV charge port. The standard length of the charging cable is 4 meters, but a
7.5-meter cable is also available.
Take into account the limited reach of a wheelchair user.
Determine appropriate ground anchoring locations where concrete exists or can be
installed (no asphalt surfaces).
Consider locations where it will be easy to add future stations.
Specification
mm
820
800
800
600
500
850
Specification
mm
820
900
900
700
500
850
in
32.28
31.5
31.5
23.62
19.69
33.46
in
32.28
35.43
35.43
27.56
19.69
33.46
25

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the MaxiCharger DC Fast and is the answer not in the manual?

Questions and answers

Brian Hughes
March 5, 2025

How do I turn on our 120kW charger remotely, from https//uscloud.autelenergy.com/charging reality.

User image 67c7e6a70f307
1 comments:
Mr. Anderson
March 5, 2025

The Autel MaxiCharger DC Fast 120kW charger can be managed remotely using the Autel Charge Cloud. Through the cloud platform, you can access the charger status, monitor energy consumption, and manage user data. However, the specific steps for turning the charger on remotely are not provided in the available information.

This answer is automatically generated

Table of Contents

Save PDF