Place the drilling template provided in the package onto the foundation, aligning
with the marked area (C). Mark the four drilling holes (D) and remove the drilling
template.
Drill four holes with over 110 mm in depth and 20 mm in
diameter
in the
foundation at the marked positions (D) for inserting the expansion bolts into the
holes. Clean the drilling ashes.
For MaxiCharger DC 120
For MaxiCharger 240
Figure 5-4 Drilling Holes
30

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the MaxiCharger DC Fast and is the answer not in the manual?

Questions and answers

Brian Hughes
March 5, 2025

How do I turn on our 120kW charger remotely, from https//uscloud.autelenergy.com/charging reality.

User image 67c7e6a70f307
1 comments:
Mr. Anderson
March 5, 2025

The Autel MaxiCharger DC Fast 120kW charger can be managed remotely using the Autel Charge Cloud. Through the cloud platform, you can access the charger status, monitor energy consumption, and manage user data. However, the specific steps for turning the charger on remotely are not provided in the available information.