Pour the concrete into the hole. Make sure that the cable duct/conduit is in the
correct position. Ensure that the conduit come out of the surface within the
marked area (C). See
Specifications.
Figure 5-3 Pouring the Concrete and Setting the Conduit
Parameter
X
X1
Y
Y1
Table 5-3 Digging a Hole Specifications
MaxiCharger DC 120
640 mm
25.2 in
820 mm
32.28 in
500 mm
19.68 in
Figure 5-4 Drilling Holes
Table 5-4 Foundation Specifications
MaxiCharger DC 120
820 mm
285 mm
640 mm
190 mm
Specification
MaxiCharger DC 240
740 mm
820 mm
500 mm
Specification
MaxiCharger DC 240
32.28 in
820 mm
11.22 in
275 mm
25.2 in
740 mm
7.48 in
151 mm
28
29.13 in
32.28 in
19.68 in
and
Table 5-6 Drilling Holes
32.28 in
10.83 in
29.13 in
5.94 in

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the MaxiCharger DC Fast and is the answer not in the manual?

Questions and answers

Brian Hughes
March 5, 2025

How do I turn on our 120kW charger remotely, from https//uscloud.autelenergy.com/charging reality.

User image 67c7e6a70f307
1 comments:
Mr. Anderson
March 5, 2025

The Autel MaxiCharger DC Fast 120kW charger can be managed remotely using the Autel Charge Cloud. Through the cloud platform, you can access the charger status, monitor energy consumption, and manage user data. However, the specific steps for turning the charger on remotely are not provided in the available information.

This answer is automatically generated

Subscribe to Our Youtube Channel

Table of Contents

Save PDF