Waters ACQUITY UPLC I-Class IVD Overview And Maintenance Manual page 76

Column heater
Hide thumbs Also See for ACQUITY UPLC I-Class IVD:
Table of Contents

Advertisement

4 Maintenance Procedures
2.
Carefully route the column-stabilizer-inlet tubing through the groove on
the side of the column compartment.
Caution:
3.
Insert the Phillips screws into the threaded holes and tighten them
gently using the Phillips screwdriver.
4.
Route the column-stabilizer-inlet tubing through the cutout in the top of
the sample manager door to the injector.
Requirement:
hinge.
5.
Remove the O-ring retainer from the inlet end of the column stabilizer
tubing. Then, connect the inlet tubing to injector port 6 of the sample
manager.
6.
Using the 1/4-inch and 5/16-inch open-end wrenches, connect the
compression fitting that attaches the column stabilizer assembly to the
optional in-line filter or to the column.
76
September, 2019, 715003738IVD Rev. C
To avoid stripping threads, do not overtighten screws.
Do not route the tubing behind the sample manager door
Note: Do not route the tubing
behind the sample manager
door hinge.
Column-stabilizer-inlet tubing

Advertisement

Table of Contents
loading

Table of Contents