Waters ACQUITY UPLC I-Class IVD Overview And Maintenance Manual page 24

Column heater
Hide thumbs Also See for ACQUITY UPLC I-Class IVD:
Table of Contents

Advertisement

2 Preparing the column heater
MS-bracket kit major components:
MS-bracket
Warning:
then allow the column compartment and its components to cool for 60
minutes before touching them. Monitor the column compartment's
internal temperature to ensure that all components are cool.
Caution:
chemical-resistant, powder-free gloves when preparing the column
heater for use with a mass spectrometer.
To install the MS-bracket:
To remove the column heater from the device chassis:
1.
Stop any currently running mobile phase.
2.
Power-off the sample manager.
24
September, 2019, 715003738IVD Rev. C
Column heater housing
MS drip tray
To avoid burn injuries, set the column temperature to Off, and
To prevent contaminating system components, wear clean,
TP03252
Hinge

Advertisement

Table of Contents
loading

Table of Contents