Required Materials; Required Tools - Waters ACQUITY UPLC I-Class IVD Overview And Maintenance Manual

Column heater
Hide thumbs Also See for ACQUITY UPLC I-Class IVD:
Table of Contents

Advertisement

2 Preparing the column heater

Required materials

Clean, powder-free, chemical-resistant gloves
50/100-mm or 150-mm column stabilizer kit:
Collet and compression screw multi-tool (collet separator)
Column stabilizer assembly
PEEK tubing for connecting the column to the MS flow cell
Three Phillips screws (one is a spare)
Three thermal gaskets (two are spares)

Required tools

Needle-nose pliers
Phillips screwdriver
To install the optional column stabilizer assembly:
1.
Stop any currently running mobile phase before replacing the column
stabilizer assembly.
2.
Disconnect the inlet tubing from injector port 6 of the sample manager.
3.
Open the column heater door.
38
September, 2019, 715003738IVD Rev. C
Location of column-
stabilizer-inlet tubing

Advertisement

Table of Contents
loading

Table of Contents