SMA SUNNY ISLAND 4.4M Operating Manual page 162

Hide thumbs Also See for SUNNY ISLAND 4.4M:
Table of Contents

Advertisement

14 Troubleshooting
Event number
Message, cause and corrective measures
9341
Status change to battery equalization charge
9362
Battery error
The range for protection against deep discharge (Deep discharge protection range) or
the range for protection during deep discharge (Deep discharge range) has been
reached.
This event message is a warning only for systems in stand-alone mode. For grid-connected
self-consumption systems, this message is an event message, not a warning message.
A fuse may have tripped at the grid-connection point.
Corrective measures:
The utility grid may not work within the set system limits.
Corrective measures:
9397
Equalization charge interrupted
The equalization charge for lithium ion batteries was interrupted because it could not be com-
pleted within the specified time. Different times can be specified for equalization charging in
SOC range 1 and SOC range 2.
9401
Energy saving mode of slaves in single-phase parallel operation
9402
Energy saving at the grid
9403
Energy saving mode start
9404
Energy saving mode stop
9601
Digital input at [xx] has changed its status to [xx]
10001
Parallel grid operation
10003
Operation status
10004
Cold start status
10006
Startup status
10007
Stop status
10010
Restart diagnosis system in device
10060
Operation at generator (at external input)
10061
Feeding network op (at external input)
10100
Parameter [xx] set successfully. [xx] to [xx]
The displayed parameter was successfully changed.
162
SI44M-80H-13-BE-en-15
• Activate the fuse.
• Replace the fuse if necessary.
• Check whether the grid parameters is still within the set system limits.
• Contact the grid operator if necessary.
SMA Solar Technology AG
Operating manual

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents