8 Operation
Procedure:
1. Open the user interface (see Section 8.1, page 104).
2. Log into the user interface (see Section 8.2, page 107).
3. Call up the menu Device parameters.
4. Click on [Edit parameters].
5. In the parameter group User Rights > Access Control change the password of the desired user group.
6. Select [Save all] to save the changes.
8.5

Starting the Installation Assistant

The installation assistant leads you step-by-step through the steps necessary for the initial configuration of the inverter.
Layout of the installation assistant
A
C
Figure 25: Layout of the installation assistant (example)
Position
Designation
A
Configuration steps
B
User information
C
Configuration field
Requirement:
☐ The personal SMA Grid Guard code of the Installer must be available for the changing of grid-relevant settings
after completion of the first 10 operating hours or of the installation assistant. You can request the SMA Grid
Guard code via the Online Service Center.
Procedure:
1. Open the user interface (see Section 8.1, page 104).
2. Log in as Installer.
112
SI44M-80H-13-BE-en-15
Description
Overview of the installation assistant steps. The number of steps de-
pends on the type of device and the additionally installed modules.
The current step is highlighted in blue.
Information about the current configuration step and the setting op-
tions of the configuration step.
You can make settings in this field.