Sign In
Upload
Manuals
Brands
SMA Manuals
Inverter
Sunny Island 4500
SMA Sunny Island 4500 Manuals
Manuals and User Guides for SMA Sunny Island 4500. We have
1
SMA Sunny Island 4500 manual available for free PDF download: Installation & Operating Instructions Manual
SMA Sunny Island 4500 Installation & Operating Instructions Manual (232 pages)
Bi-directional Battery Inverter for Stand-alone Applications
Brand:
SMA
| Category:
Inverter
| Size: 7.57 MB
Table of Contents
Sunny Island
1
Table of Contents
6
1 Introduction
12
About These Instructions
14
What to Do in Case of Transport Damages
14
General Safety Instructions
15
2 Device Description
16
Operating Modes
17
Grid-Forming Operation (RUN_U)
18
Grid-Tied Operation (RUN_I)
20
Droop-Mode Operation (RUN_U, RUN_UEXT)
21
Overload Behavior
23
Battery Management
25
Charging Methods
26
Battery States
28
Low Battery Load Mode
31
Failure of Individual Cells
32
3 Installation
33
Mounting Accessories Included in Delivery
33
Placement of the Sunny Island
35
Electric Connection
40
Preparing the Connection
40
Cable Connections
42
Examples for Connection
45
Connection to Ground
45
Connection of the Battery
47
Connection of Battery Temperature Sensor
49
Connection to AC Voltage
50
Connection Measure Generator / Mains Current and Voltage
51
Connection of a Generator
53
Connection to an External Utility
55
Connection to Generator and Utility
58
Connection of a Battery Room Fan and Electrolyte Pump
60
Connection of a Dump Load
62
Connection to "Ecopower-Mini-BHKW
63
Connection to "Ecopower-Mini-BHKW" and Utility
64
Finalization of Electrical Wiring
65
Interfaces for Communication
66
Assignment of COM1 Interface (Three-Phase Operation)
67
Assignment of COM2 Interface
68
Connection with Sunny Boy and Sunny Boy Control
69
Simple Connection at COM2 Interface
69
Multiple Connection at COM2 Interface
71
Simple Connection to PC
73
Alternative Communication at COM1 Interface
74
Assignment of COM3 Interface
75
Communication in a Three-Phase Island Grid
76
4 Operating Instructions
77
Display and Operating Elements
77
Key Assignment
78
Contrast in Display
79
Return to Status Display
79
Edit Mode
80
Menu Structure
80
5 First Commissioning of the Sunny Island
83
6 Configuration
86
First Configuration
87
Master" or Single Sunny Island ("New Sys MASTER")
87
Slave" Sunny Island ("New Sys SLAVE")
94
Configuration after Battery Exchange ("New Battery")
97
Configuration after Restart ("Restart")
100
7 Operation (OPERAT)
101
Menu "START" (2-1), Operation of the Sunny Island
102
Menu "GENSET" (2-2), Operation of Generator
103
Menu "FUNCT" (2+3), Special Functions
106
Menu „BHKW" (2+5), Ecopower Support
107
8 Settings (SETUP)
109
Menu "SETTIM" (3-1), Setting the System Clock
110
Menu "PASSWD" (3-2), Entry of Password
111
Menu "PARSYS" (3+3), Parameters System
112
Menu "PARGRD" (3+4), Parameters Grid
114
Menu "PARBAT" (3+5), Parameters Battery
116
Menu "PARGEN" (3+6), Parameters Generator
119
Menu "PARREL" (3+7), Parameters Relays
123
Menu "PARSB" (3+8), Parameters Sunny Boy
130
Menu "PARALL" (3+9), All Parameters
132
9 Operating Data (DATA)
133
Menu „DATAV" (1-0), Overview of Measured Values
135
Menu "DATSYS" (1-1), System Data
136
Menu "DATALL" (1-2), Overall Plant Data
136
Sunny Island
138
Menu "DATBAT" (1+3), Battery Data
138
Menu "DATGRD" (1+4), Grid Data
140
10 Diagnosis (DIAG)
142
Menu "ACKN" (4-1), Error Confirmation
144
Menu "HISTOR" (4-2), Overall Protocol
144
Menu "ERRHIS" (4-3), Error Protocol
145
Menu "EVTHIS" (4-4), State Protocol
145
11 Island Grids - Examples
146
Photovoltaically Powered Island Grid
147
Photovoltaically Powered Island Grid with Generator
152
Mains Backup System with Photovoltaics
156
Mains Backup System with Generator and PV
159
Integrating CHP-Units
163
Multiple Sunny Island Systems (W/ Data Interchange)
167
Single-Phase System
167
Three-Phase System
171
Multiple Sunny Island Systems (W/O Data Interchange)
174
Single-Phase System
175
Three-Phase System
175
Mixed Single/Three-Phase Systems
176
12 Terminal Diagrams for Generator Options
177
Stationary Generators
177
Temporarily Connected Generators
181
Ecopower Mini-BHKW", CHP-Units
183
13 Technical Data
184
14 Servicing and Maintenance
187
15 Warranty and Liability Regulations
190
16 Parameters (Overview)
192
17 Measured Values Displayed (Overview)
213
18 Error and Status Signals
219
Error Signals
219
Status Signals ("Events")
221
19 Declaration of Conformity
224
20 Contact
225
21 List of Figures
226
22 List of Tables
230
Advertisement
Advertisement
Related Products
SMA 4000TL-US
SMA Sunny Island 4548-US
SMA SUNNY MINI CENTRAL 4600A
SMA SUNNY ISLAND 4.4M
SMA SUNNY TRIPOWER 4.0
SMA Sunny Central 400MV
SMA SUNNY BOY 4000TL-21
SMA Sunny Boy SB 4000TL-20
SMA SUNNY ISLAND 4548-US-10
SMA Sunny Island 4248
SMA Categories
Inverter
Paint Sprayer
Control Unit
Measuring Instruments
Controller
More SMA Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL