Event number
Message, cause and corrective measures
1413
Grid incident
Phase position of the measured AC voltage at ExtVtg and AC2 does not match at line con-
ductor Lxx.
Corrective measures:
1415
Grid incident
Tie switch does not close.
Corrective measures:
1416
Grid incident
The Sunny Island system disconnects from the generator or utility grid due to a power imbal-
ance between the line conductors.
Corrective measures:
1601
Automatic generator start due to set criteria, e.g. battery state of charge
1602
Automatic generator stop due to set criteria, e.g. battery state of charge
1603
Manual generator start
1604
Manual generator stop
1605
Manual error acknowledgment of generator error
1606
Generator requested
1607
Generator started in current-controlled operation
1608
Generator stopped in current-controlled operation
1609
Grid request due to low battery state of charge
1610
Release of grid disconnection due to sufficient battery state of charge
1611
Grid request due to power limit being exceeded
Operating manual
• Ensure that the neutral conductor and line conductor are correctly connected to
connection ExtVtg.
• Ensure that the neutral conductor and line conductor are correctly connected to
connection AC2.
• Ensure that connections ExtVtg and AC2 are connected to the same line conductor.
• Ensure that the triggering of the tie switch is correct.
• Ensure that the tie switch is correctly wired.
• Ensure that the feedback contact is correctly connected.
• Eliminate any faults in the installation.