Node Verification; Sfp Repair - HP 3PAR StoreServ 7200 2-node Service Manual

Hp 3par storeserv 7000 storage service guide (qr482-96503, september 2013)
Hide thumbs Also See for 3PAR StoreServ 7200 2-node:
Table of Contents

Advertisement

Node Verification

1.
Verify the node is installed successfully:
a.
Under the Systems tree in the left panel, double click the storage system just serviced.
b.
In the lower, right of the Summary tab, in the Health section, check the State status is
Normal.
NOTE:
Figure 20 Verifying the Node Status
2.
Select Controller Nodes. The Status LED for the replaced node may indicate green and take
up to 3 minutes to change to green blinking (see
Figure 21 Replaced Node Status LED

SFP Repair

The SFP is located in the port on the controller node HBA/CNA and there are two to six SFPs per
node.
Before you begin, use either SPMAINT or the HP 3PAR Management Console to identify the failed
SFP.
SFP Identification
1.
Under the Systems tree in the left panel, select the storage system to be serviced.
2.
On the Summary tab, click the Port link to open the port's tab.
If the state is not normal contact your ASP for further assistance.
Figure 21 (page
21)).
SFP Repair
21

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents