Parallel Installation Operation - ABB PowerValue 11 RT G2 IN User Manual

6-10 kva
Hide thumbs Also See for PowerValue 11 RT G2 IN:
Table of Contents

Advertisement

16
POWERVALUE 11 RT G2 IN — 6-10 KVA
Connect UPS and OVDC box as shown in
Figure 15.
15
PDU terminal block access

3.4.5 Parallel installation operation

Up to four UPSs can be connected in parallel to configure a sharing
and redundant output power.
I/P Breaker
O/P Breaker
16
Parallel system installation diagram
From Utility
I/P Breaker
UPS 1#
UPS 2#
O/P Breaker
To Load
Mains Breaker
I/P Breaker
UPS 3#
O/P Breaker
Main O/P Breaker
Mains Mechanical or static switch
I/P Breaker
UPS 4#
O/P Breaker

Advertisement

Table of Contents
loading

Table of Contents