Other Equipment; Platform; Nozzle Pressure Gauge; Chemlocker - Hardi COMMANDER DELTA FORCE Instruction Book

Hide thumbs Also See for COMMANDER DELTA FORCE:
Table of Contents

Advertisement

3 - Description

Other Equipment

Platform

To get access to the platform, pull and tilt the ladder down. In retracted
position, the ladder is secured by a rubber stop.
From the platform following can be accessed:
• Main tank lid.
• Clean water tank lid, integrated to the side of the platform.
• Lift and remove the platform floor (A) to get access to hydraulic
and MANIFOLD components underneath the platform floor.
• Electronics and optional fast filler are situated behind the cover (B).
• Pressure gauge, EasyClean filter clogging indicator and level
indicator for the rinsing tank are visible here.
μ
ATTENTION! Always tilt up the ladder before driving.

Nozzle Pressure Gauge

The remote pressure gauge is integrated at the top of the platform. This
gauge measures the working pressure in the boom tubes as close to the
nozzles as possible.
The outputs stated in the nozzle charts are always based on the pressure
measured at the nozzle. Both when calibrating and spraying, the
pressure must be adjusted according to the readings of this pressure
gauge.

ChemLocker

A ChemLocker for storage of chemical containers or bags etc. is
mounted on the sprayer's right side.
μ
ATTENTION! Maximum load is 100 kg or 100 litres.
62

Advertisement

Table of Contents
loading

Table of Contents