Operation; Advice For Operation Of New Loader - Hyundai HL630VL Operator's Manual

Wheel loader
Table of Contents

Advertisement

ADVICE FOR OPERATION OF
NEW LOADER
All loaders were checked and adjusted before delivery from
the factory. However, during the initial running-in process,
you should still obey the following procedures, otherwise the
equipment could be damaged or its performance degraded.
If perform the operation with full load before running-in period,
it will produce adverse effect on the operation life and safety
running, and cause accidents finally.
Note:
1) Check coolant, fuel, oil and hydraulic oil
for leakage each day.
2) Check lubrication oil every day and replace it if
necessary.
3) Frequently watch the displays on dashboard and
various instruments during operation.
4) Avoid the overload of engine.
5) K e e p a l o a d o f 80% b e f o r e e n g i n e a n d o t h e r
components reaching their operating temperatures.
6) Pay attention during operation whether the working
device is working normally
7) Check for the component loose or damage due to
transportation.
8) Check the electric wires or terminals for not loose, the
instrument for normal operation, and electrolytes for
sufficiency.
9) Check Tire air pressure for normality.

Operation

Operation 3-1

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hl635vl

Table of Contents