Lcd Measurement Functions - ABB PowerValue 11 RT G2 IN User Manual

6-10 kva
Hide thumbs Also See for PowerValue 11 RT G2 IN:
Table of Contents

Advertisement

32
POWERVALUE 11 RT G2 IN — 6-10 KVA

4.7 LCD measurement functions

Use the "Select"
button to navigate
the display screen.
When the UPS starts
up, the display is in
the default UPS
status summary
screen.
Input voltage(V)
Input frequency(Hz)
Battery voltage(V)
Output voltage(V)
Output frequency(Hz)
4.7-1
Display measurement functions
Select
Output current(A)
VAC
Battery capacity(%)
Select
H
z
Load percent(%)
Select
VDC
Output power(kW)
Select
VAC
Output power(kVA)
Select
H
z
Positive bus voltage(V)
Select
Negative bus voltage(V)
Select
%
Select
%
Select
Select
Select
VDC
VDC
Select
Temperature (°C)
Select
Output receptacle 1

Advertisement

Table of Contents
loading

Table of Contents