Removing The Primary Gear; Removing The Timing Chain - Husqvarna FE 250 EU 2014 Repair Manual

Table of Contents

Advertisement

ENGINE
18
18.3.25

Removing the primary gear

Removing the timing chain

18.3.26
-
Remove pin@.
@).
-
Remove screws
-
Take off the oil pump cover.
Remove pin@).
41)
-
Push oil pump shaft
side.
48.
-
Remove force pump
O.
-
Remove nut
Info
I
Left-handed thread!
Position the special tool in the crankshaft.
I
Protection cap (75029090000)
8
-
Pull off primary gear
I
Extractor (46129021000)
8.
-
Remove screw
O.
-
Remove screws
-
Remove the timing chain tensioning rail
-
Remove the timing chain guide rail
C,.
-
Remove screw
0
Take off balancer shaft
Info
If the timing chain is going to be used again, mark its direction of travel.
inward and take it out of the engine from the ignition
(a
p. 271)
using the special tool.
(�
p. 267)
8.
C,.
with the timing chain and timing chain securing guide.
144

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents