Lubrication - Grease Schedule; Windrower Frame; Wheel Hubs; Drive Chain - Schulte SMR-600 Operator's Manual

Multi-rake
Table of Contents

Advertisement

Inspect hydraulic hoses, fittings and cylinders for
wear or leaks. Use a piece of cardboard or wood
rather than hands to search for suspected leaks.
Replace if necessary.
Before applying pressure to the hydraulic system,
be sure all connections are tight and that the hoses
are not damaged.
Do not operate this Equipment with hydraulic oil or fuel leaking. Oil
and fuel are explosive and their presence could present a hazard. Do
not check for leaks with your hand! High-pressure oil streams from
breaks in the line could penetrate the skin and cause tissue damage
including gangrene. To check for a hose leak, SHUT the unit ENGINE
OFF and remove all hydraulic pressure. Wear oil impenetrable gloves,
safety glasses and use cardboard to check for evidence of oil leaks. If
you suspect a leak, REMOVE the HOSE and have it tested at a Dealer.
If oil does penetrate the skin, have the injury treated immediately by a
physician knowledgeable and skilled in this procedure.

LUBRICATION - GREASE SCHEDULE

Windrower Frame

Castor wheel assemblies 8hrs 4 locations
Flange bearings 50 hrs - 2 locations
Frame Pivot 50 hrs - 1 location
Wheel hubs 50 hrs - 2 locations

Wheel Hubs

-Wheel Hubs: Yearly. Fill until grease is seen purging at the axle seals.
Always wear protective gloves when handling grease.

Drive Chain

Apply light grease or oil to the drive chain after every 8 hours of operation. Operating conditions may require
that the chain be lubricated more frequently. Do not allow the chain to dry out.

STORAGE

It is recommended that the chain be removed from the machine, cleaned and stored in oil over the winter
months.
Pivot drum until the cylinder is retracted. Ensure cylinder is full of oil. If cylinder is not full of oil, hydraulic
cylinders and lines are filled by holding the valve control levers in the extended position until the cylinder fully
SMR-600 04/21
© 2019 Alamo Group Inc.
MAINTENANCE
Maintenance Section 5-6
(SG-15)

Advertisement

Table of Contents
loading

Table of Contents