9 Maintenance

The following inspections and maintenance tasks are recommended at least two times per year
for good performance.
Make sure no block on airflow around the inverter. Clear up any dirt and fragments on the heat sink.
Check all the naked wires to ensure insulation is not damaged by sun exposure, frictional wear,
dryness, insects or rats, etc.
Verify the indicator display is consistent with the actual operation.
Confirm that terminals have no corrosion, insulation damage, high temperature, burnt/discolored
sign, and tighten terminal screws to the suggested torque.
Clear up dirt, nesting insects, and corrosion in time.
Check and confirm that the lightning arrester is in good condition. Replace a new one in time to
avoid damaging the inverter and other equipment.
Risk of electric shock! Confirm all the power is turned off and all the capacitor's
energy has been discharged before performing the above operations.