Installation Verification - Ruijie Networks RG-S7800C Series Quick Installation Manual

Table of Contents

Advertisement

RG-S7800C Switch Quick Installation Guide, V1.2
Figure 4-22 Connecting Power Cord on RG-S7805C
Please use the 3-pin power cord. The cross-sectional area of each pin is 1.5 mm
16A and 10A power cords are available for the RG-S7808C AC power supply. Only 10A power cord is available for the
RG-S7805C AC power supply. Adopt the proper socket and verify the AC power supply capacity in the machine room.

4.12 Installation Verification

Before you check the installation, please make sure that all power supplies have been turned off to avoid hurting you or the
switch.
Before powering up the RG-S7800C, please verify the following items:
Verify that the fan meets the requirement. See RG-S7800C Series Hardware Installation and Reference Guide for details.
Verify that the power supply is properly selected. See RG-S7800C Series Hardware Installation and Reference Guide for details.
Verify that the power module is inserted properly and the screws are fastened tightly.
Please don't power up the switch by yourself and don't perform live-line maintenance.
Verify that there is no potential danger in the working area, for example, the power supply is not grounded well, or the ground is
wet.
Please do not place the switch at a damp place to prevent the moisture from entering the switch.
Be sure of the location of the emergency power switch. If an emergency occurs, cut off the power first.
2
or 14 AWG minimum.
Installing the Switch
19

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the RG-S7800C Series and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Rg-s7808cRg-s7805c

Table of Contents