4.12 Installation Verification
Before you check the installation, please make sure that all power supplies have been turned off to avoid hurting you or the
switch.
Before powering up the RG-S7808C, please verify the following items:
Verify that the fan meets the requirement. See RG-S7808C Series Hardware Installation and Reference Guide for details.
Verify that the power supply is properly selected. See RG-S7808C Series Hardware Installation and Reference Guide for details.
Verify that the power module is inserted properly and the screws are fastened tightly.
Please don't power up the switch by yourself and don't perform live-line maintenance.
Verify that there is no potential danger in the working area, for example, the power supply is not grounded well, or the ground is
wet.
Please do not place the switch at a damp place to prevent the moisture from entering the switch.
Be sure of the location of the emergency power switch. If an emergency occurs, cut off the power first.
Verify that all power supplies are turned off if you want to turn off the power.
Verify that the power cord is connected properly and won't be loosened.
Verify that the power cord is long enough to avoid being stretched.
Verify that the rated current of the external power socket is greater 16A and that the socket is grounded well.
Verify that each power module is connected to a power socket.
Verify that the vacant slot is covered with a filler panel for ventilation and heat dissipation.
5 Logging in to the Switch
You can log in to the switch through the Console port.
Connecting Console Cables
1)
Connect one end of the DB-9 jack of the console cable to the serial port of the PC or the terminal.
2)
Connect one end of the console cable DB-9 to the console port on the supervisor module.
Figure 5-1 Connecting Switch to PC through Console Port
·
Need help?
Do you have a question about the RG-S7808C Series and is the answer not in the manual?
Questions and answers